Forum quick links
Project with mix of New Construction and Alterations
posted by Kent B on
The project is an elementary school project with four buildings on the site.
1) Building A: main elementary building. Building is being fully replaced.
Hotels-Campus guidance or LEED Interpretation 10203
posted by Ana Milinkovic on
Hello,
LEED v4 EBOM Campus/Group Benchmarking for 3 buildings sharing 1 meter and energy source for Semiconductor Manufacturing
posted by Summer Gorder on
We are working with a semiconductor manufacturing facility that would like to achieve LEED EBOM for their manufacturing facility which is on a larger campus.
LEED v4 EBOM Campus/Group 3 buildings sharing 1 meter and energy source for Semiconductor Manufacturing
posted by Summer Gorder on
We are working with a semiconductor manufacturing facility that would like to achieve LEED EBOM for their manufacturing facility which is on a larger campus.
LEED v4 Campus Approach – Certification Process for Individual Buildings Under a Master Site
posted by Keerthi Ratnayake on
Dear LEED User Community,
Cluster of small building connected by an exterior porch
posted by Summer Gorder on
The project is a small artist sanctuary. The New Construction development contains multiple interconnected single-story buildings situated across the site connected by an exterior porch.
Evolving Masterplan
posted by Nina Swanson on
Hello! I am supporting a large developer on their green building certification journey. They would like to pursue LEED at the ND level for a number of their districts.
LEED Registration for 2 buildings on same plot
posted by Pulak Goyal on
I have two buildings going for LEED v4.1 O+M Existing Buildings certification. They are connected with a bridge on 1 level.
Project phases vs LEED certification approach?
posted by Ehsan Baharvand on
Dear all, I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time): phase 1 was bui