Forum quick links
Clarification on Baseline System Type and Exceptional Calculation for Phased Data Center Project
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Dear Forum Members,
Where should Covered parking goes in exterior lighting format
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
I am working on a LEED project and I am confused as to Where should Covered parking goes in exterior lighting format.
Baseline HVAC Modelling - System 8, Electric Resistance Heating, and Heat Recovery (ASHRAE 90.1‑2010 Appendix G)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi All,
We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
Feedback after pursuing PC132
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Dirk Kestner on
We are completing our pursuit of this Pilot Credit. Overall it went well. Here are a few comments and observations:
Is pc98 required to earn pc99?
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Elizabeth Powers on
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit mea
Pilot Credit Feedback
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Jordan Millet on
This pilot credit requires participation in the LEEDuser pilot credit forum.
INc1 Bird Collision Deterrence
NC-v4.1 INc1:Innovationposted by Sean Smith on
Question regarding documenting this innovation credit, the credit requirements highlight the steps for calculating the bird collision rating (BCR), and mention we are to multiply the threat factor
Social Equity within the Project Team (Option 1)
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Atlas Turner on
Is there a reason why this pilot program for IPpc90 references social equity within the operations and maintenance staff and not social equity within the project team?
Activity Pollution Prevention Plan
NC-v4 SSp1:Construction activity pollution preventionposted by Heloise Gaza on
Hello,