Energy modeling of Seconday pump in equest:
NC-v4 EAp2:Minimum energy performanceposted by PURUSHOTHAMAN on
In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop.
Would a fieldhouse structure be included within the LEED Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by on
Our project is a community centre that includes a field house structure on site. The fieldhouse is partially enclosed, with the other portion covered by a canopy.
Multiple Cx Agents for the Option Paths
NC-v4 EAc1:Enhanced commissioningposted by Saagar Patel on
I do commissioning and I work at a design firm. When a customer pursues both Fundamental and Enhanced cx- my group would not be able to do the Cx of the project. However, we believe the
Proposed Building's HVAC system
CS-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi everyone,
Can decorative lighting be excluded from interior lighting requirements?
NC-v4.1 EQc6:Interior Lightingposted by Sara BENLOUBA on
Dear experts,
No landscape area - Is this credit not applicable?
NC-v4 WEp1:Outdoor water use reductionposted by Sonali Rawat on
Hi,
Total points for Enhanced Indoor Air Quality Strategies credit
Pilot-Credits EQpc165:Minimum Indoor Air Quality Performance: IAQP compliance pathposted by Jenni Betancourt on
We have a project that considering pursuing this pilot credit.
Pilot credit EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
NC-v4 INc1:Innovationposted by Veronica Reed on
Hello
Commerical showerheads - Are they WaterSense Labeled?
NC-v4 WEp2:Indoor water use reductionposted by Theresa Lehman on
Does anyone know if "commerical" showerheads such as the Whitehall Ligature Resistant Wall Shower (Model WH418-CSH), which has a flowrate of 1.5 gpm, and teh Whitehall Ligature Resistant ADA &
Unregulated Electricity Use
Pilot-Credits EApc161:Electrification ACP: Energy Simulation Performance Pathposted by Zeynep Cakir on
Dear all,
We are attempting this pilot credit but we are a little bit confused about the unregulated electricity input.