Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Overall Approach to LEED Application Process

EBOM-v4.1 EAp1:Energy Efficiency Best Management Practices
posted by  Colin Hulyk  on 

I have done quite a bit of research on the GBCI website and looked at the LEED requirements, but I am still having a difficult time figuring out the overall scope of applying for LEED certification

1
Mon May 10, 2021, 8:58 pm

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

3
Thu Sep 26, 2019, 9:21 am

Water Restoration Certificates

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Renee Azerbegi  on 

This is a straight forward pilot credit with benefits beyond the project boundary to various watersheds. I recommend projects pursue it.

1
Fri Feb 18, 2022, 6:28 pm

Outdoor Water Feature (decorative water fountain)

NC-v4 WEp1:Outdoor water use reduction
posted by  Sophie Kerr  on 

Are exterior water features included in outdoor water calculations?

 

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Sep 25, 2019, 7:48 pm

Submit Option 2 for a base building with certification pending??

CI-v4.1 IPc1:Integrative Process
posted by  Erica Downs  on 

Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building.  The CI project is located in a LEED-registered C&S project, but the base building is sti

1
Thu Oct 17, 2019, 3:57 am

Signage at Campus Entrance vs. Building Entrance

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Joseph Snider  on 

We have a project where we have already been through one round of review.  Reviewer wants the signage, as expected.  The entire campus is no smoking and it says that when you drive on to

1
Fri Jan 17, 2020, 7:42 pm

Filtered water faucet in Hotel Dwelling Units

NC-v4 WEp2:Indoor water use reduction
posted by     on 

I wrote a couple weeks back, with some questions on the "v4v4 1_Indoor Water Use Reduction Calculator."  I just discovered that the dwelling units will have two faucets, one for hand washing,

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Sep 24, 2019, 8:29 pm

Using Schools option 2 - Pedestrian Access for a Community Service Center

NC-v4 LTc4:Surrounding density and diverse uses
posted by  nancy picard  on 

Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2  - Pedestrian Access even if applying for another type pf building?

1
Wed Sep 25, 2019, 2:28 pm

LRV for baffles

CI-v4 EQc6:Interior lighting
posted by  Carina Clark  on 

Curious the best way to calculate SF for spaces that have paint on the structure as well as baffles that hang below.

1
Fri Oct 4, 2019, 6:56 pm