Forum quick links
Outdoor ventilation rates in baseline and proposed
CS-v4 EAp2:Minimum energy performanceposted by Sarah Leenknegt on
Hi
Overlapping Irrigation Zones
NC-v4 WEc1:Outdoor water use reductionposted by Jennifer Wehling on
Our irrigation consultant has provided an irrigation calculation where the total irrigation area (approx. 5000 SF) is more than the total landscape SF (approx. 3000 SF).
SSc1 EBOM v4.1 - Cistern that drains collected water
EBOM-v4.1 SSc1:Rainwater Managementposted by Alexis Doyle on
Question regarding the Rainwater Management Credit (SSc1) under EBOM v4.1.
Is EPD obligatory for all curtain wall assembly or just an EPD for glazing count for LEED?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello Everyone,
RE: EPD's For Assemblies or Whole Products (Mortars and Grouts)
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by John Doherty on
I am reviewing the benefit of generating EPDs for our pre-blended mortar and grout products and the challenge is the guidance via the new rules of LEED v4.
EPD's for Assemblies
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Katelyn Adley on
Hello,
DCV in baseline system
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If Demand Control Ventilation is required in the baseline system, shall the air flow rate be increased when it's useful in order to reduce the cooling demand or shall the control of the outdoor air
LEED Project boundaries with Shared Elevator/Restroom Cores/Lobby
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Brian Kish on
I am working in a 9 story, existing building in downtown Pittsburgh, PA. Our client has 3.5 floors of area that is part of our project scope of work. The lobby, restrooms, elevators/sta
LEED v4.1 makes changes for commingled waste in Option 1 - What do you think?
NC-v4 MRc5:Construction and demolition waste managementposted by RETIRED on
Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?
NC-v4 EQc2:Low emitting materialsposted by Renee Shirey on
Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for VOC content? My educated guess was fire-proofing coatings, but wasn't positive.&nb