Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

THERMAL COMFORT TOOL

Retail-CI-v4 EQc5:Thermal comfort
posted by  Toshif Ruikar  on 

Hi,

CBE, Thermal comfort tool is not longer useful for LEED documentation, is there any other way to do provide thermal comfort documentation which is acceptable to LEED.

0
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jun 20, 2020, 8:53 am

Drawings can be separately prepared and submitted?

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Yuko Murata  on 

We are currently preparing the drawings to submit to USGBC.

3
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Jun 19, 2020, 11:32 pm

IAQ Testing Post Constuction - Pre Occupancy

NC-v4 EQc4:Indoor air quality assessment
posted by  Peter Del Sette, Jr  on 

I'm try to figure out how many tests I need to run for EQ3 V4.

0

Ventless equipment in commercial application question

NC-2009 EAp2:Minimum Energy Performance
posted by  Michelle McConnell  on 

Do ventless dishmachines or ventless cooking equipment provide for leed points?  If so, how?

 

1
Fri Jun 26, 2020, 1:06 pm

Healthcare V4 - Monitoring outdoor air intake IAQ prerequisite

Healthcare-v4 EQp1:Minimum indoor air quality performance
posted by  Alessandro Zuanon  on 

Hi,

Healthcare rating system, monitoring requirements for prerequisite IAQ:

0

Outdoor Water Use Reduction - Establishment Period

NC-v4 WEc1:Outdoor water use reduction
posted by  David Valade  on 

For Outdoor Water Use Reduction - when targeting 'Option 2: Reduce Irrigation', does LEED v4 or 4.1 allow for an establishment period with potable water or can potable water not be used a

1
Wed Dec 16, 2020, 10:40 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 19, 2020, 2:35 pm

Requerimiento horario

Retail-NC-v4 SSc6:Light pollution reduction
posted by  Jorge Adalberto Bernal Segovia  on 

Existe algún requerimiento horario para el apagado y encendido de luces exteriores?

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Jun 19, 2020, 1:53 pm

Play area excluded from calculations?

NC-v4.1 SSc4:Rainwater Management
posted by  Maddie Spinski  on 

We are building an early childhood education center next to the existing elementary school.

0