Forum quick links
Enhanced Cx Envelope- Seasonal Testing
NC-v4 EAc1:Enhanced commissioningposted by Rachel Manoguerra on
What does seasonal testing look like and how does that work in regards to Envelope Cx.
VOC content requirements for wet-applied products
NC-v4 EQc2:Low emitting materialsposted by CINDY CHAI on
Hi All! Appreciate if someone can help with the following.
Interesting Credit and my experience
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Esteban Martinez on
This has been my fourth time working with this credit and while I must admit is a pretty interesting credit that seeks to implement design strategies and relate them to health/comfort of the occupa
Reneable Energy
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
Regarding Renewable Energy Production for LEED certification and also for LEED Zero certification, there is an issue which is kind of not clear to me.
EAc4: Renewable energy production - 100% renewable, local energy product from local power provider
CI-v4 EAc4:Renewable energy productionposted by Kevin Gilleran on
Hi,
My client has access to the following program:
monitoring system required for generators
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Gail Napell on
Happy November LEEDuser - the LEED requirement for generators for this Pilot is that they meet the SCAQMD requirements. The requirement also includes a monitoring system, though SCAQMD
Can short term bike rack be a covered style also?
NC-v4.1 LTc6:Bicycle Facilitiesposted by Lyle Axelarris on
I would like to verify that we can just have one bicycle covered storage unit as long as it meets the requirement of being 200 Feet from the main entrance (as required by short-term bike rack) and
Requirements to meet CO2 monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Lise Dannesboe on
Hi All
Zero Lot line / < 1 Acre site
CS-v4 SSp1:Construction activity pollution preventionposted by Sara Hickman on
Our project sits on .8 acres and is a zero lot line project (including ~25 SF of hardscape). Local juristiction exempts our project from developing a SWPPP.
Aerator with no WaterSense label
NC-v4 WEp2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone,