Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pilot Credits: Safety First - Cleaning and Disinfecting; Re-enter Your Workplace

NC-v4 INc1:Innovation
posted by  Bethany Beers  on 

We interpreted the intent of these two COVID-related pilot credits to be: provide a safe working environment during construction.

0

Base building versus tenant metering

CS-v4 EAp3:Building-level energy metering
posted by  Jens Apel  on 

Maybe I am overly cautious, but I would like to clarify the following.

4
Fri Feb 19, 2021, 3:35 pm

Carpool Hours

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Sadie Martin  on 

Hi, has anyone has success with noting the carpool stalls are only used during certain hours of the day (like during typical office hours)?

5
Fri Feb 19, 2021, 3:04 pm

Default contract length for renewable energy procurement

NC-v4.1 EAc5:Renewable Energy
posted by  Bryna Dunn  on 

Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for renewable energy procurement is 10 years.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 19, 2021, 2:39 pm

Partial "Lumens above Horizontal" calculation

NC-v4 SSc6:Light pollution reduction
posted by  Jack Ma  on 

Anyone have experience documenting an uplight light fixture with a permanent structure above for “partial lumens above horizontal” calculation, please let me know

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Feb 18, 2021, 8:54 pm

Where can we find the correct threat factors for materials?

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Janine van den Kerkhof  on 

We are pursuing this credit as a pilotcredit for a Core and Shell project of a datacenter.

2
Sustainability Manager
Burns & McDonnell
LEEDuser Basic Member
24 thumbs up
Thu Feb 18, 2021, 4:40 pm

Option2 Provide programmed Soft Space

Healthcare-v4 MRc8:Design for flexibility
posted by  Cristina Bontia  on 

The requirement states:  Locate soft space adjacent to clinical departments that anticipate growth. 

0

Wall sconce under overhang/canopy

NC-v4.1 SSc6:Light Pollution Reduction
posted by  Jack Ma  on 

Working on a project where the wall sconce will be installed under the building's overhang and canopy.  This will not light up the sky.

1
Fri Feb 26, 2021, 3:02 pm

Universal-access natural trails available to visitors, staff, or patients may account for no more than 30% of required area

Healthcare-v4 SSc7:Places of respite
posted by  Cristina Bontia  on 

If a regional trail accessible to all is within the 200ft limit, Can this be applied to both the 2% dedicated staff requirement AND the 5% required for patients and visitors? 

0