Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Gail Vittori on
We are pursuing this pilot credit for multiple unrelated projects.
Glare control requirements for Nordic projects
NC-v4.1 EQc7:Daylightposted by Medina Deliahmedova on
Dear All,
I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate.
VOC Content "Zero" and still requires TVOC Emissions Compliance?
NC-v4 EQc2:Low emitting materialsposted by Srinivasan M on
Hello Everyone,
SR Values Needed
Schools-NC-v4 SSc5:Heat island reductionposted by Brian Salazar on
Hello! Has anyone found a reliable list of SR values for materials often used at schools? For example, Outdoor tracks which have an applied coating?
Mandatory to comply with ASHRAE 90.1 2010 Section 9.4.1 for Lighting Control?
CI-v4 EAp2:Minimum energy performanceposted by shashank gangil on
We recently received the review result of a LEED v4 Commercial Interior Project.
Building Reuse calculation tools
CS-v4 MRc1:Building life-cycle impact reductionposted by Lou Niles II on
Hello looking for best tools or processes for getting the areas out of REVIT for the Building Reuse option. Reusing exterior walls, interior walls, floors, roof deck, ceilings, etc.
incorporating EPD data to WBLCA - North America
CS-v4 MRc1:Building life-cycle impact reductionposted by Brook Waldman on
For the Whole Building LCA option (option 4 for v4; option 2 for v4.1)...Can anyone provide words of wisdom regarding when/how GBCI accepts the incorporation of EPD data to the WBLCA
Any LEEDv4 limits to borrowed views through interior glazing?
NC-v4 EQc8:Quality viewsposted by Joanna Switzer on
Under LEED 2009, exterior views "borrowed" by an interior space via interior glazing - basically viewing through an interior window to see an exterior window - used to be limited to (1) layer of in
Transit facilities: no new stops, but imrpovements
ND-Plan-v4 NPDc7:Transit facilitiesposted by Carla Rincon on
Hello,
Distinct Structures - Pump House
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Kathryn Haeberle on
We are building a replacement elementary school on an existing school site. The school will get water from new wells we are installing that require a separate 'pump house'. This pump ho