Forum quick links
vegetated walls
Pilot-Credits SSpc55:Bird collision deterrenceposted by Roberto Camarillo on
Helllo.
Calculator - Summary Page missing two units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Cynthia Kaplan on
We are having an issue with our minimum IAQ calculator, namely the summary page. All of the single zone spaces transfer to the summary page fine.
Declare Label for V4 Existing Buildings credit MRc3
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Haley Duncan on
Is ILFI's Declare Label compliant with existing buildings credit MRc3?
Can planned uses be counted?
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Callie Reymann on
Our project is a school within a larger neighborhood redevelopment plan. The city will build housing nearby with enough dwelling units to count towards a community anchor use.
Advanced Energy Metering Owner & Tenant spaces
CS-v4 EAc3:Advanced energy meteringposted by Aishwarya Chengappa on
I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law.
Substituted LEED 4.1 Form on a LEED v4 project
NC-v4.1 IPc1:Integrative Processposted by Vincent Pieri on
Hello,
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Aaron Humbert on
This credit is used within our practice to further review and select materials. As more projects pursue the BPDO credits due to more manufacturers and products having EPDs & HPDs, this gr
Baseline system selection for data center project above 1,50,000 sqft of area.
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Rameez Lal on
I have came across a paper which says even if the white spaces(data halls) in a data centre building constitute the majority area of the project, the system selection for white spaces can be system
Experience achieving this credit, EApc95?
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Chris Yates on
Hello all,
NCv4 - EAc Advanced Metering - VRF system
NC-v4 EAc3:Advanced energy meteringposted by Margaret Montgomery on
We have a clinic project that is all electric, and will be submetering to meet the Advanced Metering criteria, but we're not finding clarity on one particular point.