Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option 1 Path 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  shaun Andriano  on 

Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day.

9
Tue Apr 17, 2012, 4:41 pm

Documenting VOC content in products

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Petra Hajná  on 

Hi everybody... again. Does anybody know if manufacturers' letters are accepted as proper documents to proof VOC levels?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 17, 2012, 4:32 pm

Unable to receive the Energy Star Rating

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Dorilee Torres  on 

Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US.

3
Tue Apr 17, 2012, 3:59 pm

EAp2/EAc1 Renovation Vs. New construction

NC-2009 EAp2:Minimum Energy Performance
posted by  Steven Beccia  on 

We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and building interior.

3
Default Avatar
Mechanical Engineer
Clark Nexsen
LEEDuser Basic Member
4 thumbs up
Tue Apr 17, 2012, 1:28 pm

Development density - just touches a building

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Lawrence Lile  on 

My development density radius just touches a 92,000 square foot hotel, which will kick me over the 60,000 sq ft per acre limit.

4
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Mon Apr 16, 2012, 6:59 pm

Epoxy flooring system and Indoor Air Quality

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Petra Hajná  on 

Hi everybody! Do you have any experience or suggestions on how to deal with application of polyurethane / epoxy flooring system in underground garage floors in scope of IEQc3? Is temporary sealing

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 16, 2012, 9:28 am

slab-on-grade floor

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In Table 5.3 point 5 of annex G of ASHRAE 90.1-2007 I find that for the baseline building performance “opaque assemblies used for new buildings (..) shall confirm with the following common lightwei

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 16, 2012, 8:46 am

Leather

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Agustina Galli  on 

Hello! We are building a deluxe hotel and the interiorist is willing to use leather coating for room doors.

2
Fri Apr 13, 2012, 7:23 pm

Tennant HVAC System Unknown

CS-2009 EAc1:Optimize Energy Performance
posted by  Marco Marco  on 

Hi all, I am working on a whole building simulation according to Appendix G. The 10 storey building is divided on 3 tennants.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 13, 2012, 6:42 pm

CS project: How do I know the regularly occupied spaces?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Susan M. Kaplan  on 

Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 13, 2012, 12:26 pm