Forum quick links
ANSI 12.60-2002
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by M Carolina Weitzman on
HELP!!! Where do I find 2002 version of this ansi standard? I can't locate anywhere!
PTHP
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Kristin Heinz on
We are working on a hotel with PTHP units. PTHP units have manual outdoor airflow monitors that, once set, are not adjusted unless the unit is taken apart.
Retail and scope for Eap2
CS-2009 EAp2:Minimum Energy Performanceposted by Francine Vaz on
I have a commercial building that will apply for LEED Certification that has the following situation: • The groundfloor has only retail stores in this pavement and the lobby.
Do manual shades count as glare control devices?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Maura Adams on
Subject line asks it all.
CI Project outside US - Energy Star list
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sustentator Argentina on
We are working in a CI project in Argentina.
New equation and better definitions - Addenda August 2011
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Susann Geithner on
A new equation to calculate credit compliance has been added. Base on a weighted average you now may also show credit compliance.
Design Bike Racks- CS FFM, Germany
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tobias Silies on
In the forum discussion I found the note the number of required bycicle parking spaces depends on the no.
EAp2
CI-2009 EAp2:Minimum Energy Performanceposted by Monika Mickute on
We recently purchased a 7,000 SF, 1-story office building for our own use. We are attempting LEED CI Platinum but are not touching the exterior walls or roof.
Self-Declared compliance
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Alison Y Rivenburgh on
Has anyone had any luck submitting materials that are "self-declared" compliant from the manufacturer?
Zone air distribution ventilation effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maria Kutelova on
I need help with determining proper case for the Air Distribution Configuration per table per Table 6-2. The forth entry required a velocity of 150 cfm to be reached within 4.5 ft of floor levels.