Part of my project is considered as fit out which means that there are some office floors where the area is divided into offices and to each office a chilled water tap point is provided is air conditioining and heating design is done but the tenant is expected to bring the a/c unit and to do his own duct distribution.
my question is can I consider these areas as designed and assume one big fan coil serving each office?and how leed reviewer would considere it other wise