High VOC coatings prior to closing a space
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Maya Karkour on
Hello, Does anyone know if we can use paints or coatings with VOC content well above the LEED requirements, as long as the envelope walls are not yet constructed (i.e., the surfaces are considered
E Cigarettes
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Robin Obaugh on
Has there been any commentary on whether how "e-cigarettes" align or do not align with the intent of this credit?
1/4 Mile Walking Distance - Crosswalks
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Mark Hirschi on
I am working on a project that is on a busy road. There are a couple of bus stops (two different routes) on the other side of this road from my project.
recirculation
NC-2009 EAc1:Optimize Energy Performanceposted by jaume balana on
Is it mandatory to have recirculation (for a system 4)?
Adhesive category for Foster 85-20
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?
Defining the baseline
NC-2009 EAc5:Measurement and Verificationposted by Gustav Alfaro on
Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based
LEED Interpretation #10134 as applied to fan coils
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Silvia Ruiz on
Hi, Would a project be eligible to apply for this credit if the scope of work includes the provision and installation of 100% of the fan coils serving the certifiable space, even if they don't ha
EP Confusion re: SS C3.1,.3.2, and 3.3
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Elizabeth Ingram on
Hi Tristan! I am studying for the LEED 2009 ID+C and am confused regarding the graphics for the above credits and the way the EP is mentioned. They seem to differ.
LEED 2009 ID+C Study Guide Typo? IEQ C2
CI-2009 IEQc2:Increased Ventlilationposted by Elizabeth Ingram on
Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits?
Tenant spaces Completion
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Joel Cheely on
We are renovating urban buildings into apartments and speculative retail/commercial space. Some of the retail/commercial space will be constructed prior to application and some won't.