Regarding Quality Views

NC-v4.1 EQc8:Quality Views
posted by  Nagaraj Sankar  on 

Hi all, In quality views, we need to examine atleast one of two views catagories as per our LEED V4.1 BD+C quality views. how can I prove that

0

What suggestions are there for the case of moisture damage from rain?

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Karen Shilo  on 

Is it possible to utilize heating systems during new construction in order to dry out some moisture damage from rain prior to construction completion?

1
Tue Jan 3, 2023, 5:33 pm

Air Sampling High Rises for Recertification

EBOM-v4.1 EAp2:Fundamental Refrigerant Management
posted by  Karen Shilo  on 

What is the best way to air sample in the most efficient and cost effective way for a residential high rise for recertification?

0

Question regarding Occupancy sensor

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Nagaraj Sankar  on 

How can we show and  prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on 

0

Commingled Waste v4 Documentation

NC-v4 MRc5:Construction and demolition waste management
posted by  Samantha Lee  on 

What is required to be submitted for commingled waste in LEED Version 4? Does the commingled waste have to sent to a Certified Recycling Institute?

 

5
Default Avatar
Sustainability Engineer
Turner Construction
LEEDuser Basic Member
0 thumbs up
Tue Dec 27, 2022, 4:13 pm
1
Fri Dec 30, 2022, 3:47 pm

exhaust fan/fume hood

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Kai Starn  on 

Hi, working on a new school k-12 project with a chemistry lab. Does the 40 dBA background noise requirement need to be met concerning the fume hood?

3
Fri Dec 23, 2022, 7:40 pm

LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?

NC-v4 EQc2:Low-emitting materials
posted by  Summer Gorder  on 

We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.

0

LEED O+M v4 Pilot Credit Integrative Process- Participation in the Forum

Pilot-Credits IPpc101:Integrative Process
posted by  Yanjun Xing  on 

Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s pro

0