Regarding Quality Views
NC-v4.1 EQc8:Quality Viewsposted by Nagaraj Sankar on
Hi all, In quality views, we need to examine atleast one of two views catagories as per our LEED V4.1 BD+C quality views. how can I prove that
What suggestions are there for the case of moisture damage from rain?
NC-v4 EQc3:Construction indoor air quality management planposted by Karen Shilo on
Is it possible to utilize heating systems during new construction in order to dry out some moisture damage from rain prior to construction completion?
Air Sampling High Rises for Recertification
EBOM-v4.1 EAp2:Fundamental Refrigerant Managementposted by Karen Shilo on
What is the best way to air sample in the most efficient and cost effective way for a residential high rise for recertification?
Question regarding Occupancy sensor
NC-v4 EAp1:Fundamental commissioning and verificationposted by Nagaraj Sankar on
How can we show and prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on
Commingled Waste v4 Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Samantha Lee on
What is required to be submitted for commingled waste in LEED Version 4? Does the commingled waste have to sent to a Certified Recycling Institute?
Waste Oil as renewable energy
NC-v4.1 EAc5:Renewable Energyposted by Vitor Leite Goncalves on
Dear all,
exhaust fan/fume hood
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Kai Starn on
Hi, working on a new school k-12 project with a chemistry lab. Does the 40 dBA background noise requirement need to be met concerning the fume hood?
LEED v4.1 If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?
NC-v4 EQc2:Low-emitting materialsposted by Summer Gorder on
We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.
LEED O+M v4 Pilot Credit Integrative Process- Participation in the Forum
Pilot-Credits IPpc101:Integrative Processposted by Yanjun Xing on
Our project is pursuing LEED O+M plantinum certification, during the whole O&M period, we establish an integrative process team to improve our work efficiency. According to the owner’s pro