Forum quick links
Recycled/regional material in total cost if outside LD Boundary?
NC-2009 MRc4:Recycled Contentposted by Laura Charlier on
Hi there, We have a project where the permeable pavers that are going in likely will contain recycled/regional materials we can account for.
Does LEED AP/GA Count?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Ara Massey on
If the Qualifying Contractors, Subcontractors, and Building Trades have passed the LEED AP or GA test does that meet the requiremetns of this Pilot Credit?
Vdzd - primary air flow
NC-2009 IEQp1:Minimum IAQ Performanceposted by SW LEE on
in this project, each regularly occupied space have ventilation grill and OA grill - separately. in the LEED form, should i determine the Vdzd are both the ventilation CFM and OA CFM?
How LEED credits are awarded
NC-2009 SSc2:Development Density and Community Connectivityposted by Mike Foresee on
Here's a very Basic Question from a LEED novice studying to take the BD+C specialty exam: Most categories have one credit associated with them. The category, SSc2, has a possible 5 credits.
ADA showerhead
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lisa Marshall on
Our project has 2 out of 10 shower stalls that are considered ADA shower stalls.
changes to Regional Priority credits
NC-2009 RPc1:Regional Priorityposted by Devani PERERA on
The credits available for regional priorities on the link above and the credits available on LEEDonline do not tally for my project.
EZ
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Cheryl Burkinshaw on
I am working on a small project with a design team that is fairly new to LEED.
Electric Shower
NC-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower?
LEED Exam question
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Farah A. on
A new office project will have 200 employees and anticipates an estimated 30/visitors a day. During peak periods, the building will be occupied by 210 occupants.
SSp1 / ESC plan and the Multi-Building Campus Guidance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Laura Billings on
Hi there - I'm working on a 4-building office campus that is being developed all in one phase.