NC-2009 IDc1: Innovation in Design
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Scott Bowman
LEED FellowIntegrated Design + Energy Advisors, LLC
LEEDuser Expert
519 thumbs up
April 26, 2014 - 10:25 am
Sorry, I have not seen this used before. You could ask a CIR or proceed but have something else as backup (or use this as backup to something else).
David Edenburn
ESD ConsultantRetired
17 thumbs up
April 27, 2014 - 10:04 am
Scott: Thanks for the quick response. Generally it is a rule of thumb that almost any EBOM credit can be brought over for an ID point, but I would like to see if anyone has actually done it for this particular case. I may put in a CIR, but not sure if we have the time. I just wanted to pad my point buffer a little.