Forum quick links
LEED CS & CI built at the same time.
CI-2009 IDc1:Innovation in designposted by Emmanuel Gee on
Hello, We have a project where the CS and one CI tenant is being built at the same time.
DOOR ADEHSIVE
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by jack larson on
I have a special synthetic resin adhesive developed for flush door construction.
Performing testing under Option 2 - number of samples
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Adriana Hansen on
For performing testing under Option 2 (IAQ Testing), for a singular space above 25,000 sf served by several similar AHU systems, could it be acceptable using the “1/25,000 SF or each contiguous are
small strips of plywood
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by jack larson on
Most regular composite wood contains/ added urea formaldehyde.
District Energy Systems-Chilled Water
EBOM-2009 WEc1:Water performance measurementposted by Alexa Stone on
How does DES and purchasing of chilled water from utility fall into this credit? The guidance from the LEED DES document does not cover WE credits. Thank you!
VOC budget shortcut
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Nick Shaffer on
Is there an interpretation or language in the reference guide I am missing to support the statement above of "Is there a shortcut to the VOC budget method if you have just one product that is used
FTE calculation for gallery space
NC-2009 PIf3:Occupant and Usage Dataposted by Ilya Zavaleev on
I have a mixed used core and shell building with the following space types: - Retail - Office - Large gallery in the middle of the bulding which works as a main entrance to the large campus develop
IEQ 4.3 LEED Online Form Drop Down menu for adhesives
CS-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Gina Dennis on
We are uploading to LEED Online using a Beta form "v.0.2.3" in the IEQ 4.3 Form. IEQ 4.3 requires us to list the adhesives (from IEQ 4.1) used for the flooring.
Becomming LEED AP BD+C during LEED project
NC-2009 IDc2:LEED Accredited Professionalposted by Roger Moquin on
I, Is it ok for LEED IDc2 if i become LEED AP BD+C just before the start of the project or late in the project. I am the administrator of the project. Thank you.
Can a Graded Pad Site Meet SSp1?
NC-2009 SSp1:Construction activity pollution preventionposted by Michael Hoffner on
Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.