Forum quick links
material reuse and regional material
NC-2009 MRc5:Regional Materialsposted by Henrique Mendes on
I´m studying for the AP test and have a question. If I´m working on a major renovation project and reuse the bricks from a fireplace to create a sidewalk, can I account this as material reuse AND R
EAp 1 Performance Period
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by LUCY WILLIAMS on
I am working on an international facility that is pursuing LEED-EB.
Benifit of view-preserving automated shades?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Paul Rogers on
I understand that if view–preserving automated shades are incorporated, that the project need not comply with the 500fc requirement.
Life and Light Output
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Simon Sue on
This credit requires not only the mercury content of the bulbs, but specific life and light output using specified testing methods: · Life of bulb: 3 hours on/20 minutes off for fluorescent bulbs;
Still Confused?!?
NC-2009 SSc1:Site Selectionposted by JoAnn Jolin on
While I've been a LEED AP for several years, this is my first time being the person inputting data into the online forms.
Additions in the interior of the existing building
NC-2009 PIf2:Project Summary Detailsposted by VICTOR MORENO on
Hello, In the project that I manage is summarized in a rehabilitation of an existing building in which rehabilitates all floors.
EAC2 Form Definitions
NC-2009 EAc2:On-Site Renewable Energyposted by Robert Wichert on
The EAC2 Form asks for "Annual Renewable Energy Cost". I believe this is the SAVINGS from the renewable energy.
Question about MEP components
CS-2009 MRc4:Recycled Contentposted by Morteza Kasmaei on
Are registers, fixed bar return air grilles, and diffusers considered as MEP components and cannot be included in the MR calculation?
district heat pumps
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Two buildings (“building A” and “building B”) are on adjacent sites. The project team wants to achieve two different LEED NC certifications.
FSC WOOD
NC-2009 MRc7:Certified Woodposted by jack larson on
Three questions 1) The LEED reference guide states that both FSC pure and FSC mixed credit can both be claimed as FSC 100 %. It does not specify the type of system that ought to be used.