Forum quick links
Hotel guests
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Isabel Conde on
Hi, For an hotel. How can we count the guests?. Residents, FTE, or visitors/transients?. Thanks!
Central Chilled Water Plant
NC-2009 EAp2:Minimum Energy Performanceposted by Marcus Sheffer on
We are investigating how a building which houses a central chilled water plant for a campus can meet the prerequisite.
Entryway Systems in Vestibules less than 10'
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Amari Roskelly on
Good morning all! We are currently working on a dining facility with vestibules at the two main points of entry.
Mineral Wool
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Cheryl Burkinshaw on
Does this credit apply to mineral wool firestopping? I'm looking through a submittal for firestopping and trying to determine if the products in front of me will jeapordize this credit or not.
Energy Star
CI-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello! If we choose the performance option (Section 11), do we still have to comply with the 50% rated power Energy Star?? Thanks!!
Building Reuse of a previous LEED buiilding on same site
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Dan Milewski on
I have a question regarding compliance with this credit as long as MR Credit 1.2. Would this credit apply to a situation in which we are renovating (i.e.
Performing Arts Building may have periodic smoking on stage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sara Greenwood on
Hello, I am working on a performing arts building that has a no-smoking policy for the interior and within 25' of the building.
Equivalents in Europe
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Mike D on
Has anyone ever used local equivalents instead of the Energy Star rating? ID#1492 states that we can use local equivalents.
Building with future additions connecting interior spaces
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by LEED Pro Consultant on
Hello all, We are working on an industrial facility with an adjacent office building that is looking for a NC certification LEED v2009.
Insulation and UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sheryl Swartzle on
Would insulation be exempt from the "no added UF" requirement?