My reviewer for this credit (MRc5) has questioned our usage of the location of the harvesting / extraction being the same as the manufacturer for the steel products. I contacted the steel company again and got the following documentation: “For projects that are located less than 500 miles from the mill, consider the recovery / harvest point as the mill location. The Regional Material Value can be calculated using 100% of the recycled content (recovered/harvested scrap) of the product used.” Does anyone think this wording is a problem as it relates to this credit? As always, thank you for the input. Todd B.