Deadline for hiring CxA
NC-v4 EAc1:Enhanced commissioningposted by Elizabeth Powers on
Does anyone know if there is a deadline for hiring the CxA in the v4 credit? I know I'd recommend no later than DD, as that but am unclear if v4 has a hard deadline.
4.1 calculators
CI-v4.1 IPc1:Integrative Processposted by Kena David on
Has anyone been able to access updated v4.1 credit calculators? Is there any guidance on using new calculators versus v4 calcs at this point?
PC 101 LEED v4.1
Pilot-Credits IPpc101:Integrative Processposted by Summer Minchew on
Our project team has implemented the Integrative Process for a project that was initially registered under LEED v4 O+M but during the course of the project was converted to LEED v4.1 O+M.
Resort: Baseline HVAC
NC-v4 EAc2:Optimize energy performanceposted by Amal Venugopal on
Greetings!...
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA.
System 2 as the baseline system for the whole project
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!...
Long-term bicycle storage definition - Covered
NC-v4.1 LTc6:Bicycle Facilitiesposted by Luc Doucet on
Is there a guideline as to what constitutes an acceptable "covering" in order to obtain an adequately protected long-term bicycle storage from rain and snow?
VOC compliant resinous flooring products?
NC-v4 EQc2:Low emitting materialsposted by Cindy Quinn on
Has anyone been able to find a resinous flooring system compliant with v4 or v4.1? We are coming up short. Thanks!
run off volume calculation methodology - help needed
CS-v4.1 SSc4:Rainwater Managementposted by Konstantina Kalliakoudi on
Hello to all Leed users,
I am new at this credit. I have a project in which I want to implement Option 1.