Forum quick links
PFP fan allowance in Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a VAV with PFP system for basecase, and I need to know how to count for the zone fan power in table 1.4, knowing that I did enter each AHU's fan power from the Energy model to table 1.4, the
Can FEV/LEV Spaces In Existing Parking Areas Count?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi all - I'm working on a v3 NC major renovation project.
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
How do I know which projects are a similar managerial and technical complexity than the one I am working on?
What if other element meets the intend of the credit ?
Pilot-Credits EQpc78:Design for active occupantsposted by George Sebastian Naghiu on
What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?
Glazing (windows) area - VOC
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Does we need to integrate glazing area in Option 2 : Budget calculation method ? Thank you for your help
System 8 Fan Power Allowance
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear All, I have a system 8 (VAV with PFP boxes) baseline and I had a reviewer's comment stating that: "The interior fan demand reported in Table EAp2-4 for the Baseline case exceeds th
Certification RQs for Incomplete Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Orçun Özhelvaci on
Our university building undergoes it's construction stage.
LEED EBOM, SS2 & Water Efficiency
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by AtSite Inc on
How many sq. ft. of landscape is needed to qualify for landscape credits?
Lighting control in office space
NC-v4 EQc6:Interior lightingposted by Jeroen Sap on
I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override.
Evaporative Chiller in EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Yastimy Jupson on
Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c