Energy Star Portfolio Manager

Schools-2009 EAc5:Measurement and verification
posted by  Becky Dix  on 

Is it possible to achieve one point of this credit (like you can for NC) by just registering the project with Energy Star Portfolio Manager?

6
Sustainability Director
Lake|Flato Architects
LEEDuser Premium Member
78 thumbs up
Mon Mar 23, 2015, 8:17 pm

EPA SmartWay Elite vs LEED

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Kristina Abrams  on 

Are the EPA SmartWay Elite requirements more or less stringent than the ACEEE Green Score requirements

3
Default Avatar
AIA, LEED AP BD&C
Ayers Saint Gross Architects
LEEDuser Basic Member
2 thumbs up
Mon Mar 23, 2015, 5:17 pm

Demolition of existing building

Schools-2009 MRc2:Construction waste management
posted by  Matthew Heaton  on 

I’ve encountered a differing of opinions regarding the Construction Waste management credit (MRc2) and could use some help.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 23, 2015, 3:54 pm

Eligible CxA for Design&Built project

NC-2009 EAc3:Enhanced commissioning
posted by  Panupant Phapant  on 

Hi We are working on the project that the owner performs both design and construction activities.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sun Mar 22, 2015, 1:27 am

One Shift Peak FTE vs Daily Average

NC-2009 PIf3:Occupant and Usage Data
posted by  Tommy Linstroth  on 

Hi, I'm working on an outpatient clinic that has 1 shift of workers (8-4, 5 days/week). Per the owner, there are 52 FTE. Since there is only 1 shift, this is the peak and the daily average.

2
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Fri Mar 20, 2015, 4:35 pm

cxa requirements

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  andres ramirez  on 

Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.

3
Thu Mar 19, 2015, 10:16 pm

Bike racks/storage for retail customers in mixed use building

CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Charles Nepps  on 

Our project is mixed use office and retail. Secure bike storage is provided in the parking garage for regular building occupants.

2
Thu Mar 19, 2015, 4:15 pm

Fire suppression system

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Michela Tedeschi  on 

Hi all,I'm now working on a project under LEED certification that aims to achieve IEQc5. Hazardous gas and chemical use areas are served by sprinkler system as a fire suppression system.

2
Thu Mar 19, 2015, 2:06 pm

No external hardscape

EBOM-2009 SSc2:Building exterior and hardscape management plan
posted by  Michela Tedeschi  on 

Hi all, I'm now working on a building without exterior hardscape (the LEED boundary is based on the building footprint).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 19, 2015, 2:05 pm

Equipment which uses NO water

Healthcare-v2009 WEc4.3:Water use reduction - food waste systems
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, I've seen in a brochure some equipments which do not use water. Do these devices make us eligible and qualify automatically for this credit?

4
Thu Mar 19, 2015, 12:14 am