Forum quick links
Updated SF Pesticide Hazard Screening List
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Trista Brown on
Heads up that an updated list came out in September 2013 and can be accessed here - www.sfenvironment.org/sites/default/files/fliers/files/sfe_th_pesticides_reviewed_091313.pdf We'll be updating
Meeting the 5% landscape requirements with planters
NC-2009 WEc1:Water Efficient Landscapingposted by Rahul Yadav on
Hi, The credit says that for applying the points, minimum 5% of the site area shall have planters, garden etc. Does the potted plants are counted under planters.
Renewable Energy in Template EAp2 (Healthcare)
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello.
Feature 11 - On-site exercise room
Pilot-Credits EQpc78:Design for active occupantsposted by Laura Crawford on
Our project is located in a city that has a mild climate year round and outdoor activities are common and in demand.
Entryway systems
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by José Solis on
1) In the C&S 2009 requirements for IEQc5, there is a statement that says "Core & Shell projects that do not have entryway systems cannot achieve this credit." What exactly does that mean?
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by GISELA FARHAT DE ARAUJO on
Hi To achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
Calculation of Green Power
Schools-2009 EAc6:Green Powerposted by Kerrie Kannberg on
Green Power is listed throughout the credit as the total electricity consumption of the building, yet the credit (EAc6) is performing the calculation from table 2-10 in the Energy Model from EAp2,
Bike racks for adjacent buildings?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Becky Dix on
This project is an academic building on a higher education campus in the United States.
LEED project boundary and Data Centers
NC-2009 EAp2:Minimum Energy Performanceposted by Bethany Beers on
Hello, We have a new construction office building project in which a data center/computer room occupies about 10% of the area, but probably 95% of the load/energy.
Does a fresh air intake for a garage need to comply?
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ward Miller on
We have a project in which the location of the fresh air intake for the garage parking is proposed to be located