Forum quick links
v2009_Minimum Energy Performance Calculator_v6
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a warehouse project targeting at LEED 2009 certification.
Mosquitos eradicate substance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Tota Yun on
How I can know if this substance which already used by the contractor in new construction project comply with LEED DELTABAZ 25 EC
Plaza at grade building above.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Paul Rogers on
I am working on a project where the exterior space consists of an alley way and an outdoor plaza. The outdoor plaza is on columns under the building volume.
Material Calculator
NC-2009 MRc4:Recycled Contentposted by Byrne Lambkin on
I am unable to download the material calculator from the Document Tool Kit
ongoing tracking - recert. guide vs. v06 form
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Jareb Ketay on
We're at a loss as to what documentation (if any) is required for this credit for a recertification effort, given differences in information between the Recertification guide and the v06 forms. Th
Case study for preliminary analysis
CS-v4 IPc1:Integrative processposted by LEED Pro Consultant on
The credit states to perform a preliminary analysis of energy and water related systems.
Option 2 Air Testing- Measuring VOCs
NC-v4 EQc4:Indoor air quality assessmentposted by Helene Lefkowitz on
While looking into Option 2- Air Testing, a member of our project team presented the following questions as they believe this method is not achievable at this time: 1) Are there currently any labs
Circulating Fans
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I have some fans In my building which operate to circulate air. They are low speed when occupied and then ramp up to full speed with Temperature goes above 80F.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Sara Greenwood on
Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.
Mechanical Ventilation for Multifamily Highrise Bedrooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Neil Sen on
I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.