Forum quick links
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Installation of Lighting Posts
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Claire Bannister on
We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?
Energy Model for Ice Rink
NC-v4 EAp2:Minimum energy performanceposted by Shenhao Li on
Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.
Green Cleaning Plan
NC-2009 IDc1:Innovation in Designposted by Gregory Martin on
Just received comments back on a project and was surprised at the number of issues with our Green Cleaning Policy. This is a template I have used without any comments/issues in the past.
100% certified wood
NC-2009 IDc1:Innovation in Designposted by Abdulla Anwar on
Dears, Our project is aiming for innovation design credit of 100% FSC certified wood, my concern is about does (FSC mixed) certified product contributing to this credit or only the (100% FSC) cert
Owns Building
CI-2009 EAc3:Measurement and Verificationposted by Kristopher Croghan on
If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct?
ASHRAE 90.1-2007: Minimum Efficiency Requirements (Heat pump)
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Mato Rial on
Hello Everyone: I am working in an office building project located in Galicia (Spain). We are carrying out the selection process of the heat pump for the air conditioning of the building.
dimension calculation methodology
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Noriko Nagazumi on
When we calculate "regulary occupied space" for EQc8.2, is it supposed to be inside of wall or "center on center" ?
HERS rating for 3-Stories multifamily building
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Mugdha Mokashi on
For low-rise multifamily buildings is it possible to show compliance with this prerequisite by achieving a HERS index of less than 75?
Exterior lighting not yet designed
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling at the moment is supposed to have exterior lighting for the facades, some parking lots and some walkways. The exact LPD however is still to be calculated and