Forum quick links
Is Education still acceptable?
NC-v4 INc1:Innovationposted by Deborah Lucking on
Does anyone have any insight on whether Education is still an acceptable way for a project to achieve an Innovation credit point under LEEDv4? Thanks!
Water Bottle Filling Stations
NC-2009 WEc3:Water Use Reductionposted by Norma Lehman on
do these count in our standard water calculations? if not, can we include them as process water to earn exemplary?
Construction and Demolition Waste Management Plan
NC-v4 MRc5:Construction and demolition waste managementposted by milo valenti on
we are looking for an excel template to do the following! tracking truck picks up C+D takes it to recycling facility!That ticket is expanded into a excel sheet to track what was recycled from that
occupancy sensor in big offices
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.
Option 3 fueling capacity determined by time limit?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Erica Downs on
Our project is at a large university, and a 2-plug Level 2 station has been installed.
End Uses
NC-2009 EAc5:Measurement and Verificationposted by Matthew VanSweden on
I realize that EAc Advanced Energy Metering is not listed in the v4 credits that you are allowed to use on v2009 projects but has anyone had any success utilizing the v4 metering language of "insta
LEED CI 2009 Innovation option: Monitoring Based Commissioning
CI-2009 IDc1:Innovation in Designposted by Margaret Montgomery on
This option in the innovation catalog is noted as adapted from LEED v4 EAc Enhanced Cx, and I'm not clear if it would be counted as an additional above-2009-enhanced-cx strategy, or if it's somehow
AHU LEED Certificate
NC-2009 EAc5:Measurement and Verificationposted by Tota Yun on
We got this quote from manufacturer regarding AHU compliance ((While some sections of this standard do not apply to our product, we do comply with the sections that apply. According to the standa
walk-in closets in residential
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alfonzo Collins on
I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.
Material Streams in New Construction
NC-v4 MRc5:Construction and demolition waste managementposted by Allison Wilson on
My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you