Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
0

Pharmaceutical Manufacturing factory project

Healthcare-v4 MPR1:Must be in a permanent location on existing land
posted by  Magda Aghababyan  on 

Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.

1
Sat Aug 26, 2017, 3:26 pm
1
Tue Jun 6, 2017, 7:55 pm

Lavatories in special conditions

NC-2009 WEp1:Water use reduction
posted by  Vanessa Montezuma Ramos  on 

Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.

1
Mon Jul 10, 2017, 6:27 pm

CBECS energy use intensity

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Ricardo Sá  on 

What is the adequate indicator for estimating the energy use intensity for a supermarket (100% electricity) using the CBECS?

1
Tue Jun 6, 2017, 6:54 pm

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2:Innovative wastewater technologies
posted by  Brian Bartholomew  on 

Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys

1
Sat Aug 26, 2017, 9:52 pm

How much of the area inside the LEED boundary must be included?

NC-2009 WEc1:Water efficient landscaping
posted by  Lawrence Lile  on 

We have a project where a good part of the non-hardscaped area inside the LEED boundary will be planted in native prairie grasses, with no irrigation.

1
Wed Jun 7, 2017, 10:02 pm

Regulated vs. Unregulated??

NC-v4 EAc2:Optimize energy performance
posted by  Edgar Arevalo  on 

I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem

1
Wed Jun 7, 2017, 1:39 pm

Wrong Diversion Method

NC-2009 MRc2:Construction waste management
posted by  Chris Anderson  on 

I have a problem, our construction waste management plan didn't specify Load-specific diversion reports, so all of the reports we have received (5 months) have been facility average rates.

1
Wed Jun 7, 2017, 5:22 pm

Points awarded for reduced conditioned space

NC-v4 EAc2:Optimize energy performance
posted by  Amrit Kaur  on 

LEED V4 homes awards ( and generously) for residential projects with areas smaller than an accepted reference standard, and deducts points for residential units exceeding these standards.

1
Sat Aug 26, 2017, 12:59 pm