NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
Calibration
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors.
Resources Links not working
NC-2009 SSp1:Construction Activity Pollution Preventionposted by RYAN BEN SABILALA on
I noticed some of the links for the Resources Page are not working anymore. Can anyone do an update? Thank you.
Dynamic Glazing for IDC ?
NC-v4 INc1:Innovationposted by Sriranjani Ramachandran on
Can anyone claim points under the Innovation in Design Credit-Path 1 for using dynamic Glazing in the project?
Herbicides and Pesticides used during performance period
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Joseph Snider on
I am a bit confused about the use of herbicides and fertilizers for landscaped areas within the LEED boundary.
belated project registration / certification process feedback
CS-v4 SSp1:Construction activity pollution preventionposted by Daniela Mendez on
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City.
Pressurization requirements in LEED v4
NC-v4 EQp2:Environmental tobacco smoke controlposted by Judhajit Chakraborty on
We have a project where the hallways are pressurized to provide ventilation air thru door undercuts.
Vertically Attached Project
CS-v4 EAc2:Optimize energy performanceposted by LEED Pro Consultant on
Our team is working on a project which follows a vertically attached approach.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
asbestos contamination
CI-v4 INc1:Innovationposted by emily reese moody on
I have a CI project that has asbestos in the existing space that must be addressed for our project.