Zinc Spray

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Andreas Soederberg  on 

I am looking for a product to replace zinc anti corrosive aerosols. I have two questions: 1. Did I understand the LEED criteria correctly?

1
Sat Nov 15, 2014, 3:12 am

Regularly Occupied Space

NC-2009 PIf3:Occupant and Usage Data
posted by  Keelan Kaiser  on 

Would theater/performance dressing rooms and special dedicated "star" dressing rooms be considered regularly occupied spaces with regard to IEQc8.1 and 2?

0

Rolling Shades

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ema S  on 

Are rolling shades mandatory when doing the prescriptive method?

1
Thu Nov 13, 2014, 2:49 pm

loading bay inside building footprint

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.

0

daylight sensing

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I wonder whether daylight sensing (lights are dimmed automatically according to daylight) can increase the points a project can obtain in this credit. Table G36.2 doesn’t mention such a system.

1
Thu Nov 13, 2014, 3:52 pm

Data Center in Portfolio Manager

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Charalampos Giannikopoulos  on 

How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.

1
Tue Jan 17, 2017, 9:45 pm

Data Center in Portfolio Manager

Data-Centers-EBOM-v4 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.

1
Mon Aug 28, 2017, 6:19 pm

Furniture components assembled on-site

CI-2009 MRc5:Regional Materials
posted by  Eric Thompson  on 

We have a project where elements of the furniture are coming to the jobsite and being assembled there.

1
Sat Nov 15, 2014, 5:44 pm

ID credit in a hospital?

Schools-2009 IEQc10:Mold Prevention
posted by  Payette Library  on 

We're thinking about going for this credit for a Hospital project (NC v2.2), since code requires all hospitals to have strict mold prevention measures.

1
Fri Nov 14, 2014, 7:19 pm

Parking Roof

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Noriko Nagazumi  on 

Are we supposed to include parking roofs on SSc7.2 heat island - roof's calculations? I assume that all roofs should be included.

1
Fri Sep 11, 2015, 7:30 pm