Documentation after EPD threshold reached

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Andrea Vickers  on 

Hi - I thought I had found somewhere that LEED requires you to continue counting products with EPDs (applies to HPDs/materials ingredients as well) even after you reach the threshold targ

1
Fri Dec 8, 2023, 5:00 pm

Chlorine Flush vs. IAQ Assessment

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Mike Bahr  on 

Has anyone here done an IAQ assessment around the same time as a chlorine flush of the domestic water system and plumbing fixtures?

1
Tue Jan 16, 2024, 8:47 pm

Change of space during performance period

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Pulak Goyal  on 

I have a building going for LEED O+M v4.1 Existing Buildings Certification. 

0

Bird glazing that meets quality views credit requirements

NC-v4 EQc8:Quality views
posted by  Blake Weaver  on 

I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing.

1
Thu Apr 18, 2024, 12:57 am

Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1

NC-v4.1 EAp2:Minimum Energy Performance
posted by     on 

A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1.  Building breakdown as follows:

1
Fri Apr 5, 2024, 2:12 pm

Meeting the credit intent

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Jon Hall  on 

The credit intent states the following: Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and economic

2
Associate
Thornton Tomasetti
LEEDuser Premium Member
3 thumbs up
Wed Dec 6, 2023, 10:52 pm

Energy Metering Displays

NC-v4 EAc3:Advanced energy metering
posted by  Allison Para  on 

Hello Pros,

I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 5, 2023, 8:07 pm

Existing Parking Lot

NC-v4.1 MPR2:Must use reasonable LEED boundaries
posted by  Laura Soma  on 

If building next to an existing parking lot, which will serve the new structure, does the parking lot footprint need to be included in the LEED project boundaries?  Assume there will be minor

1
Wed Dec 6, 2023, 8:43 pm

Retail FTE Access

CS-v4 LTc6:Bicycle facilities
posted by  Michelle Rosenberger  on 

This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities.

1
Wed Dec 6, 2023, 8:57 pm
8
Mon Dec 4, 2023, 8:41 pm