Documentation after EPD threshold reached
NC-v4.1 MRc2:Environmental Product Declarationsposted by Andrea Vickers on
Hi - I thought I had found somewhere that LEED requires you to continue counting products with EPDs (applies to HPDs/materials ingredients as well) even after you reach the threshold targ
Chlorine Flush vs. IAQ Assessment
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Mike Bahr on
Has anyone here done an IAQ assessment around the same time as a chlorine flush of the domestic water system and plumbing fixtures?
Change of space during performance period
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Pulak Goyal on
I have a building going for LEED O+M v4.1 Existing Buildings Certification.
Bird glazing that meets quality views credit requirements
NC-v4 EQc8:Quality viewsposted by Blake Weaver on
I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing.
Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by on
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
Meeting the credit intent
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Jon Hall on
The credit intent states the following: Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and economic
Energy Metering Displays
NC-v4 EAc3:Advanced energy meteringposted by Allison Para on
Hello Pros,
I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.
Existing Parking Lot
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Laura Soma on
If building next to an existing parking lot, which will serve the new structure, does the parking lot footprint need to be included in the LEED project boundaries? Assume there will be minor
Retail FTE Access
CS-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities.
Electric vehicle charging station used in demand response strategy
NC-v4 EAc4:Demand responseposted by Martina Salonen on
Hi!