Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Walkable Project Site Innovation credit applicable to a university campus building?

NC-v4 INc1:Innovation
posted by  Darrah Jakab  on 

I'm working on a higher ed building in a pedestrian-only area of campus that I believe would be a good candidate for this credit. Has anyone had sucess in achieving this credit for a college c

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Fri Jan 12, 2024, 1:38 am

View Type 1 with non-continuous window glazing

NC-v4 EQc8:Quality views
posted by  Edgar Arevalo  on 

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are a

8
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jan 11, 2024, 6:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Thu Jan 11, 2024, 5:43 pm

MERV Filters for PM 2.5

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Banu Banu  on 

Dear All, 

In our project we have Direct Evaporative coolers . It is a garment production building. In Evaporative coolers, usually the process is mixing of Air & water. 

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Thu Jan 11, 2024, 5:25 am

LEED Daylight Simulation Option1 with IES-VE

NC-v4 EQc7:Daylight
posted by  Mahshid Sedighimoghaddam  on 

Hello everyone,

We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1.

0

Desiccant Wheel Modeling for Baseline case

NC-v4.1 EAp2:Minimum Energy Performance
posted by  John   on 

I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well?

2
Associate Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Wed Jan 10, 2024, 11:12 am

Thermal Comfort Control

NC-v4 EQc5:Thermal comfort
posted by  Martin Maribo  on 

How can individual thermal comfort controls be achieved for individual workstations in an open office?

2
Wed Jan 10, 2024, 1:02 am

Electricity with Demand Flexibility

Pilot-Credits EApc152:GridOptimal Building ACP
posted by  Cory Duggin  on 

What is the best way to determein any electricity with demand flexibility?  What should I input in the form if it is 0?  If I enter 0 it acts like all fields haven't been filled out, so I

2
Opsis Architecture
LEEDuser Premium Member
14 thumbs up
Tue Jan 9, 2024, 9:36 pm

CDWM - Recycling Facility Diversion Rate

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Preethi Sreeraj  on 

It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast

0

Location of outside airflow measuring station inside the HVAC unit

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Edgar Arevalo  on 

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engine

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jan 5, 2024, 3:05 pm