I am working on an CI for Retail project. The Retail space will be included in an shopping mall and is three floors high.
Energy Model Approach - Central Plant serving the Project Space
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Amal Venugopal on
Dear All,
CI-2009 EAc1.3, Motor Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by David Schaeffer on
I am working on a tenant build out where all the equipment is existing, as part of the recent core and shell build.
CI-2009 EAc1.3, Option 1 HVAC Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Joseph Girgenti on
beginning design of a LEED 2009 CI project. Will be replacing AC units so want to spec units with efficiency adequate to meet this requirement. Requirement references NBI Advanced Build
Core Performance Guide Compliane
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Patrice McVeigh on
Hi All,
We have a CI project and have a query in relation to Core Performance Guide Criteria.
CI Office v2009 - Water Cooled Chiller in Base Case & DCP in Proposed Case
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SSN Energy Model on
Hi All,
Greetings!
CI-2009 EA c1.3 Optimize Energy Performance HVAC
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jamal Anwar on
For Leed EA C1.3 calcs to comply with Core Perf Guide:
Appropriate Zoning and Controls Questions
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Patrick Salmon on
We have an open office VAV project that is only pursuing the "Appropriate Zoning and Controls" portion of Option 1.
Option 1: Equipment Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ricardo Sá on
Hi, I have several compact rooftop units serving a big sales area. However, only 80% of them is actually new equipment that meet the credit's criteria.