Adequate measurement equipment and procedures
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by CAIO DE MELO on
We are working on an office building with fan-coils units conditioning office spaces on typical floors and several multi-split ceiling cassette units conditioning technical occupied areas (maintena
Measurement at DOAS before fixed dampers
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).
Airflow testing service
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Saul Pichardo, AIA on
Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M project.
Occupancy rates
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
I am not sure why it says on the documentation screen shot that the total occupancy for the VRP calcs should be consistent with occupancy for other credits.
IAQ calculator v03
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
Filling the Minimum Performance Calculator for 100% OA
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Rasita Masalskyte on
SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.
10% exemption
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that doesn't hav
EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
Our EBOM 2009 project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the IEQp1-A1 VAV data input form.
CO2 measurements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, In our project there are AHUs providing a mix of outdoor and return air.