Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

In-Unit Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I've received a comment from the LEED reviewer after they denied my approach in calculating the LPD for the proposed building (dwelling units).

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Mar 30, 2016, 3:21 pm
7
Default Avatar
Associate
Hurley Palmer Flatt
LEEDuser Basic Member
5 thumbs up
Wed Mar 30, 2016, 2:59 pm

Baseline System 8

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, Just a small clarification about the heating plant of System 8. It is written that heating is Electric resistance.

5
Tue Mar 22, 2016, 4:56 pm

Responses to preliminary review comments

NC-2009 EAp2:Minimum Energy Performance
posted by  David Browne  on 

My engineers' submittal for this prerequisite resulted in a lengthy list of comments, with a requirement that a narrative response to each comment be provided.

2
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Mar 17, 2016, 2:48 pm

Hotel guest room using natural ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a hotel guest room that will use natural ventilation to meet the building code requirement for ventilation. In this case, I wonder how we should model the baseline case.

10
Wed Mar 16, 2016, 3:56 pm

ASHRAE 90.1 2007 vs 2013

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Wahjudi  on 

Hi all. Can we use latest standard of ASHRAE 90.1 2013 instead of 2007 as stipulated at reference guide? Noted that the latest standard will have more stringent requirement.

4
Wed Mar 16, 2016, 1:59 am

On-site CHP Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  MURAT DOĞRU  on 

Dear all, We are modeling a hospital building which is served by two 800kW CHP systems. The CHP systems are dedicated to this building only, i.e.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 10, 2016, 8:05 am

Need your Advise - Urgent (Sports Hall Project)

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities.

13
Mon Mar 7, 2016, 8:54 pm

Alternative Standard to ASHRAE 90.1-2007 Appendix G

NC-2009 EAp2:Minimum Energy Performance
posted by  Jourdan Younis  on 

We have a project that consists of two connected buildings: an admin building and a factory building.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 3, 2016, 7:21 pm

Waste Oil Fuel

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Daly  on 

I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 11, 2016, 9:49 pm