FAQs about EAp2 :

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

EAP2 required HAP input summary

For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft. The glazing input summary alone is over 20 pages. If I were to upload all inputs there would probably be a few hundred pages of data.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/04/2016 - 20:30

I've frequently seen comments about "auto-sized boilers." On those projects I submitted a screen shot of the boiler plant properties (sizing configuration tab).

Mon, 04/04/2016 - 20:41

I looked a little deeper and on that project we actually did upload 45 pages of "input summaries" as well as several screenshots. Robert at software.systems@carrier.utc.com helped clear things up. You can also use the feedback button to get clarification from the review team.

Mon, 04/04/2016 - 22:29

For HAP you should upload the following reports - LEED EA Credit 1 Summary Report, Roof Constructions, Wall Constructions, Window Constructions, Space Input Data, System Input Data, Plant Input Data. This should cover all that needs to be uploaded for both input and output reports.

Tue, 04/05/2016 - 20:12

Thank you for the responses. I checked the space input data and that alone was almost 500 pages. I suppose I should have consolidated the spaces into larger thermal blocks for the LEED submittal, but I used this HAP file in the beginning of the design process to size CFMs for every individual room.

Wed, 04/06/2016 - 04:47

Dear All:- we also using HAP But our project floor area is 90000 Sq.ft but A/c area is just 5,400 Sq.ft Fans in Ventilation area is considered as process load and the remaining load in Ventilation area such as (Lighting & Equipment load ) is considered as Misc load in this case what are the Inputs we need to submit (the ventilation area is given in Additional area tab available in HAP (Building Level misc data)) Options are 1.Ac Space Input data & Systems input summary 2.All spaces Input summary & Systems input summary

Sat, 04/09/2016 - 05:35

Awaiting for your reply