ASHRAE Baseline Model Question

NC-2009 EAp2:Minimum Energy Performance
posted by  Nan ZHANG  on 

Dear all, I'm establishing a baseline model for an office building in ASHRAE climate zone 6. The HVAC system of the proposed building only has heating radiators using municipal supplies for winter

3
Wed Apr 17, 2013, 6:11 am

Change in lighting schedules due to increased daylighting.

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

Dear community, we are doing a 90.1 App. G simulation for an existing manufacturing warehouse renovation + office building addition.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 8, 2013, 9:19 pm

Mandatory provisions for a heat pump

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I have to model a heat pump that outside the building exchanges heat with the external air and it exchanges heat with the building, i.e. with the internal part of the HVAC plant, thorough water.

3
Mon Apr 8, 2013, 2:05 pm

Does 10-4 Mandatory provision apply for process electric motors?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to the indu

7
Thu Apr 4, 2013, 2:40 pm

Doubts about a Magnetic Chiller COP Value

NC-2009 EAp2:Minimum Energy Performance
posted by  María Fernanda Aguirre  on 

Hi: We are working in a project in Lima Perú and the HVAC Engineer has just sent to us a submittal sheet of a Magnetic Chiller with a COP of 10,8.

5
Default Avatar
Architect LEED AP BD + C - LEED AP ID + C
Renato Miranda and Associates
LEEDuser Basic Member
4 thumbs up
Tue Apr 2, 2013, 12:58 pm

LEED After or Before?

NC-2009 EAp2:Minimum Energy Performance
posted by  Robert Sutton  on 

Ok I am new to LEED but my architect is telling me that most of the LEED submission take place after the construction documents are done.

16
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Mar 25, 2013, 1:51 am

Unconditoned Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Chinthaka Jagodaarachchi  on 

There are several unconditioned spaces in a project that I'm working on. For Energy simulation, should those spaces be modeled as having cooling & heating systems?

5
Wed Mar 20, 2013, 7:27 pm

R values

NC-2009 EAp2:Minimum Energy Performance
posted by  Robert Sutton  on 

It is true that the R values in 90.1 have to be used as a minimum in the performance rating calculations? Using tables and materials description sets the basis for your baseline model?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 14, 2013, 4:47 pm

Data Centers - Efficiency for UPS and computer servers for the

NC-2009 EAp2:Minimum Energy Performance
posted by  Carlos Garcia  on 

Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.

5
Tue Mar 12, 2013, 10:08 pm

COP CHILLER BASELINE

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hi, I have to recalculate the chiller COP of Baseline Building, to consider the power of the fans? Or just put the COP marked by Standard 90.1 and attributed the fan power calculated by the Stan

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up