Forum quick links
Compromise between Dust Control by Watering & Water Consumption
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Abdulrahman Sherazy on
The best way I experienced in dust control measures in construction roads is to cover these roads by crushed stone, compact it by the compactor, and finally water it frequently.
CONCRETE WASHOUT STATION-WATER REUSE
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ISOLDA SALINAS on
Hello Everyone,
SSp1 Required information
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
Ending ESC Monitoring - what stage in construction?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by David Bell on
Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement. I.e.
Campus project - joint ESC plan and measures
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Melinda Orova on
Hi, We have a Campus project with 1 existing LEED certified building and 2 new buildings to be constructed on a Mastersite that is owned and operated by one company.
Excavation material from LEED Project is moved outside the LEED boundary on adjacent land.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Adrian Arenas on
Hello Everyone
LEED Boundaries & Construction Boundaries
NC-2009 SSp1:Construction Activity Pollution Preventionposted by soha yamani on
ESC Plan and Project LEED Boundary in Campus project we are working on a campus LEED project that have four different contractors working on four different buildings that will be registered for LE
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
Perimeter controls for urban projects
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Max Zayika on
What are the most widely used types of perimter sediment controls for urban projects (with existing hard site paving)?
Sediment trap outside the project boundary
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Mesquita on
It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt.