Forum quick links
Difficulty uploading the form
NC-2009 PIf1:Minimum Program Requirementsposted by Avery Gretton on
Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".
Reasonable Project Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Katherine Norris on
Hello! The project I am working on is a full renovation of a historic building on a University campus. The building has three wings connected by "hyphens" to effectively form an "E" sha
MPR #6 - Option 3
NC-2009 PIf1:Minimum Program Requirementsposted by Edgar Arevalo on
So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences. However, since I've been charged with filling out the instructions ta
PI Form 1, Must Use a Reasonable Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Vincent Pieri on
Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar
LEED 2009 Submission deadline
NC-2009 PIf1:Minimum Program Requirementsposted by Amy Harmon on
Is there a deadline for projects that have been registered as 2009? Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?
Airport Terminal Project Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Kaarina Nehring on
Hi all,
Report multiple electric meters on Energy Star Portfolio Manager
NC-2009 PIf1:Minimum Program Requirementsposted by Edward Gulick on
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric
Defining 'one building'
NC-2009 PIf1:Minimum Program Requirementsposted by Erin Holdenried on
I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?
Can
NC-2009 PIf1:Minimum Program Requirementsposted by Qiang Zhang on
I have a critical issue about the LEED v4 boundary, i have attached several images for your reference. To discuss with the developer, we are going to certify the 1 2 3 4 as a whole building, 1 is
LEED boundary for a railway station
NC-2009 PIf1:Minimum Program Requirementsposted by Juan Sergio Simborio on
LEED NC 2009 Our project is a major railway station in Qatar.