Difficulty uploading the form

NC-2009 PIf1:Minimum Program Requirements
posted by  Avery Gretton  on 

Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".

1
Thu Dec 10, 2020, 5:01 pm

Reasonable Project Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Katherine Norris  on 

Hello!  The project I am working on is a full renovation of a historic building on a University campus.  The building has three wings connected by "hyphens" to effectively form an "E" sha

1
Wed Jun 19, 2019, 5:38 pm

MPR #6 - Option 3

NC-2009 PIf1:Minimum Program Requirements
posted by  Edgar Arevalo  on 

So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences.  However, since I've been charged with filling out the instructions ta

0

PI Form 1, Must Use a Reasonable Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Vincent Pieri  on 

Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar

0

LEED 2009 Submission deadline

NC-2009 PIf1:Minimum Program Requirements
posted by  Amy Harmon  on 

Is there a deadline for projects that have been registered as 2009?  Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?

1
Thu Nov 15, 2018, 4:58 am

Report multiple electric meters on Energy Star Portfolio Manager

NC-2009 PIf1:Minimum Program Requirements
posted by  Edward Gulick  on 

I am (finally) wrapping up documentation on a multi-tenant building.  It is a LEED-NC project because over 50% of the leaseable space is owner-occupied.  The building has 4 electric

1
Mon Apr 2, 2018, 4:38 pm

Defining 'one building'

NC-2009 PIf1:Minimum Program Requirements
posted by  Erin Holdenried  on 

I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?

1
Wed Nov 7, 2012, 3:03 pm

Can

NC-2009 PIf1:Minimum Program Requirements
posted by  Qiang Zhang  on 

I have a critical issue about the LEED v4 boundary, i have attached several images for your reference. To discuss with the developer, we are going to certify the 1 2 3 4 as a whole building, 1 is

1
Mon Aug 12, 2013, 3:09 pm

LEED boundary for a railway station

NC-2009 PIf1:Minimum Program Requirements
posted by  Juan Sergio Simborio  on 

LEED NC 2009 Our project is a major railway station in Qatar.

1
Thu Dec 19, 2024, 4:28 am