Interiors Life-Cycle Impact Reduction - Option 3 Design for Flexibility
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Laura Riegle on
Hi,
I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project.
Surface area or just cost?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Diego Prada on
Hello everyone,
LCA for only furniture, is it possible?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Eslam Ahmed on
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished.
Is drywall considered a demountable feature?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Andrea Tayah Esperão Malta de Campos on
I am working on a project for a commercial interior planning under ID+C certification that opted mainly for an open space plan but in certains areas there are some drywalls to convey priv
50% surface area reuse
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Mark Ragucci on
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.
Pursuing Furniture reuse--cost vs. value of repurposed or refurbished items
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Lisa Adams on
Refurbished or repurposed items would be less costly than purchasing new, i.e.: a refurb task chair may be free or half the cost of a new one. The credit lanugage states to "include the
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Nikhita Sapuram on
Most WBLCA software programs do not include product specific data.
Path 3: Proposed building values exceeding 5% in one category.
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Gaston Michaud on
Hi everyone,
Can reuse of an existing sealed or polished floor be included?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by on
And in this case, since the slab is structural, the replacement cost would just be the cost of the sealant or polishing process, right?
Building Interiors Life Cycle Assessment - Reuse and/or Salvage Materials
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Amanda Cunningham on
We are considering pursuing option 3 Building Interiors Life Cycle Assessment. Has anyone pursued this option and included "building reuse and/or salvage materials"?