Forum quick links
Thermal Comfort Control
NC-v4 EQc5:Thermal comfortposted by Martin Maribo on
How can individual thermal comfort controls be achieved for individual workstations in an open office?
CDWM - Recycling Facility Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Preethi Sreeraj on
It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast
Location of outside airflow measuring station inside the HVAC unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsm
Schools-NC-v4 WEp2:Indoor water use reductionposted by Alexia Anastassiadis on
Hi all!
Shower in Mixed Use Residential/Retail
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
I am confused about the shower requirement in a residential building that has retail space on the ground floor.
LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?
NC-v4 SSc5:Heat island reductionposted by Julie Baines on
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.
Location of outside airflow measuring station inside the HVAC unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Runoff calculation - typical values for infiltration loss
NC-v4 SSc4:Rainwater managementposted by G.J. Teunissen on
Hi,
What are the standard values for the infiltration losses in the equation below for rainwater management credit? eg: previous pavements and vegetated roof.
How to claim "NC-v4 EAc3 - Advanced energy metering" credit for Villas
NC-v4 EAc3:Advanced energy meteringposted by QUANG DOAN on
Before diving deep into the question, to gain more insight into the project, please read the following overview:
One Tenant - two spaces across a public corridor - can this be certified as one project?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Helen Kessler on
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple l