Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Glare control device simulation - Option 2

NC-v4 EQc7:Daylight
posted by  Hanh Truong  on 

Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).

1
Thu Jul 13, 2017, 2:17 pm

ESC plan

NC-v4 SSp1:Construction activity pollution prevention
posted by  Ana Paula Quiros  on 

Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.

1
Tue Jan 17, 2017, 4:37 pm

Analysis areas for large building

NC-v4 EQc7:Daylight
posted by  Jody Lee Potvin-Jones  on 

Hi, For EQc7: Daylight.

1
Thu Sep 18, 2014, 3:10 pm

What certifications are accepted by USGBC for v4 low-emissions?

CI-v4 EQc2:Low emitting materials
posted by  Randal Carter  on 

The USGBC has posted, and will continue updating, a "Low-Emitting Materials Third-Party Certifications table" at this link: http://www.usgbc.org/resources/low-emitting-materials-third-party-cert

1
Sat Aug 26, 2017, 9:32 pm

Ceiling Step Down

NC-v4 EQc8:Quality views
posted by  Kim Lombard  on 

Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?

1
Mon Aug 28, 2017, 11:25 am

Opt 2 metered water use with unoccupied building

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

If we had submeters installed for more then 80% fixtures in the building but the building is unoccupied during the perfomance period we must use (as the reference guide seems to state) the optio

1
Tue Jun 27, 2017, 12:30 am

Walkable Street - Item D Functional Entries

ND-Plan-v4 NPDc1:Walkable streets
posted by  Ian Scott  on 

Where a mixed-used building as a mix of residential and non-residential and both residential and non-residential building entrances. Do both residential and non-residential entrances count?

0

[Innovation Credit] Bicycle Alternative

EBOM-v4 INc1:Innovation
posted by  JOHN COOK  on 

Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.

1
Thu Nov 12, 2015, 7:17 pm

Ashrae 90.1 2010 Appendix G

NC-v4 EAp2:Minimum energy performance
posted by  junaid naseer  on 

Do we need to follow addendums of ASHRAE 90.1 2010 in relation to Appendix G for compliance? For instance, addendum F restricts window to wall ratio to 34% for hotel/motel with rooms greater than

1
Mon Apr 25, 2016, 2:18 pm

STC rating for the combination office - hallway

NC-v4 EQc9:Acoustic performance
posted by  Florian Schmidtchen  on 

Dear all, I have a question according to meet the composite sound transmission class (STCC) ratings listed in Table 1: Do we have to meet the STC rating for the combination 'office - hallway' for a

0