Products with Zero-VOCs disclosed by MFG
CI-v4 EQc2:Low emitting materialsposted by Stacey Olson on
If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?
Pressure flow rates
EBOM-v4 WEp1:Indoor water use reductionposted by OSCAR DE LA RED on
When introducing the design flow rate values in the indoor water calculator for option 1 calculated water use, we should use the flow rate fixtures values associated to the actual facility pressur
TVOC range for flooring?
NC-v4 EQc2:Low emitting materialsposted by Tommy Linstroth on
I'm trying to figure out where you get the TVOC range for anything for flooring, namely Floorscore or CRI Green Label Plus?
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
Interior Lighting Quality
NC-v4 EQc6:Interior lightingposted by April Wang on
Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.
Lighting Levels
CI-v4 EQc6:Interior lightingposted by Kristopher Croghan on
For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?
School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Low-Emitting Materials Calculator
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Since October 1, there were updates on VOC requirements, but the calculator does not appear to have been updated.
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.
BPDO Calculator / Total materials cost
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Wilcox on
Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Where does ‘Total materials cost’ number come from?