To comply with EA_p2 we are goint to develo the energy simulation of the Tenant Space Scope of Work.
My questions are:
1. Do we have to include the whole building characteristics in the Mínimum Energy Performance Calculator that replaces the TAble 1.4, or is it enough to include the Tenant Space Scope of work?.
2. If it is so, for the Baseline model, would it be right to assign the HVAC System correspondint to that space, which would be a exception and not the Primary HVAC system of the building?,
thank you!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.