Forum quick links
Differences between design phase and construction phase
NC-v4 MPR3:Must comply with project size requirementsposted by JORDI CASTELLANO on
hello everyone,
our project has achieved the design phase of LEED review.
Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Optimize energy on Datacenter equipments
NC-v4 EAc2:Optimize energy performanceposted by Amine Zeidane on
Hello,
thinner use for cleaning purposes
CS-v4 EQc2:Low emitting materialsposted by monica castro urbina on
The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the VOC's limit required in the SCAQMD rule 1143?
Energy Model Scope for CI Project with independent HVAC system
CI-v4 EAc2:Optimize energy performanceposted by Marie Garcia on
hi Marcus / hi everyone,
LEED Interpretation 10480
NC-v4 EAp2:Minimum energy performanceposted by susan eguia on
Hi,
Is anyone here aware about LI 10480 requirements?
Appreciate sharing information please.
thanks,
Susan
Letter reerred to who?
NC-v4 EAp3:Building-level energy meteringposted by Dayanna Cardenas on
It may be a dumb question but I better ask right?
I got the template, I got the owner to agree to sign but who should I refer it to?
Hospitality counts?
Hospitality-NC-v4 LTc6:Bicycle facilitiesposted by GBD Architects on
Hi - anyone have an answer to how to do counts for hospitality? It doesn't seem reasonable that you'd be counting guests to get your final numbers.
Option 2 - Natural Hydrology
NC-v4 SSc4:Rainwater managementposted by Michelle Rosenberger on
We are confused by the vagueness of these requirements.
Building Envelope CxA
NC-v4 EAc1:Enhanced commissioningposted by Harry Flamm on
This is a question with a slightly different twist from some other recent posts: