Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Informal Transit...

EBOM-v4 LTc1:Alternative transportation
posted by  Shakir Ismail  on 

Hi,

Struggling to find options for alternative transportation for a planned LEED EBOM project in Qatar :S

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Dec 17, 2018, 8:09 pm

Typo in View Factor Chart

NC-v4 EQc8:Quality views
posted by  Chris Edmonds  on 

In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".

0

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Yoyo Shek  on 

Hi All,

How do we control the maximum number of cycles of the cooling tower?

0

Baseline for CI when the CS certification is being carried out simultaneously

CI-v4 EAp2:Minimum energy performance
posted by  Sansiago Velez  on 

This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.

1
Mon Dec 17, 2018, 3:31 pm
1
Tue Dec 18, 2018, 1:38 pm

Previously developed land

Warehouses-NC-v4 LTc2:Sensitive land protection
posted by  Prakash Sekar  on 

Location: Malaysia

Project type: Warehouse

1
Mon Dec 17, 2018, 2:19 pm

How to control the maximum number of cycles of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Yoyo Shek  on 

Hi All,

How do we control the maximum number of cycles of the cooling tower?

Is it by controlling bleed off rate and make-up water rate? 

Thanks in advance!

1
Mon Dec 17, 2018, 6:23 am

Laminating adhesives in composite wood assemblies

NC-v4 EQc2:Low emitting materials
posted by  Craig Graber  on 

Does the "Composite Wood Evaluation" address shop-applied laminating adhesives used in composite wood assemblies like millwork? I've searched this forum, Ref.

5
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Dec 14, 2018, 11:05 pm

ASHRAE 90.1 compliance within tenancy areas

CS-v4 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

Hi, 

 

we are applying LEED BD+C v4 Core & Shell to a large office building. Scope of Core & Shell works inside tenancy areas:

 

1
Tue Dec 18, 2018, 8:13 pm

Advanced Energy Metering for each tenant spaces?

CS-v4 EAc3:Advanced energy metering
posted by  Yoyo Shek  on 

Hi All, 

I would like to clarify if every tenant spaces owned by different tenants requires individual set of advanced meters?

3
Default Avatar
Village Consulting
LEEDuser Basic Member
2 thumbs up
Thu Dec 13, 2018, 2:41 pm