Mon Mar 25, 2019, 7:26 pm

Are designated smoking areas required?

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Anna Kaelin  on 

My project prohibits smoking onsite and within 50 ft of the building. There are no designated smoking areas on the property.

1
Mon Mar 18, 2019, 10:20 pm

Data Centre energy model baseline

NC-v4 EAp2:Minimum energy performance
posted by  Ameet AA  on 

Hello,

For a large data centre, I was thinking the baseline should be:

- HVAC: system 8

- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9

4
Mechanical Designer
Integral Group
LEEDuser Basic Member
13 thumbs up
Mon Mar 18, 2019, 7:24 pm

Mandatory. lighting controls for Proposed case

NC-v4 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 
Dear concern We are working in a huge industrial project without any lighting controls such as dimming control , Occupancy sensor and time relay Our clarifications are 1.Is there any mandatory
2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Mar 18, 2019, 7:09 pm

Clarifications in automatic lighting controls - Occupancy sensor, Programmable dimming control

NC-v4 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear Concern:-

we have industrial manufacturing with office building we have applied LEED V4 NC certification 

 

1
Mon Mar 18, 2019, 7:12 pm

DES Cooling tower

EBOM-v4 WEc3:Cooling tower water use
posted by  Elyse Dufrene  on 

Can DES cooling tower serving the project be used to demonstrate water consumption reduction for cooling tower water use credit?

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Fri Mar 15, 2019, 3:21 pm

Views for Medical Exam Rooms

NC-v4 EQc8:Quality views
posted by  Kyle Ritchie  on 

Our project is pursuing LEED v4 BD+C certification and is a University building.

6
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Mar 15, 2019, 1:43 pm

Alternative structure and enclosure limit

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Susan Heinking  on 

My team is working on a project that involves a high quantity of structural material and according to the handbook, "Structure and enclosure materials may not constitute more than 30% of the value

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Mar 15, 2019, 10:01 am