Forum quick links
Energy Modeling for Addition to Existing LEED NC-2009
NC-v4 EAp2:Minimum energy performanceposted by Joe Cavanaugh on
Our proposed project is to add about 30,000 square feet to an existing 55,000 square foot University science building. The existing building is LEED Gold under NC-2009. We hope to
Light boundary for shopping center can be established at property line
Retail-NC-v4 SSc6:Light pollution reductionposted by Fernando Calderon on
We have a Retail project which is a large, corner store for a shopping center.
how is considered Paris’ tramway ?
NC-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
how is considered Paris’ tramway ?
CS-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
Work surfaces in Residential Units?
NC-v4 EQc6:Interior lightingposted by Kristen Magnuson on
Hello,
Option 2 - Strategy F: work surfaces comply but no movable partitions in the project
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:
Can you get an ID credit on a CI project from being in an EBOM certified building?
CI-v4 INc1:Innovationposted by on
Now that v4 has changed things a bit, I was wondering if I could apply the EBOM cert for an ID credit on my CI projects in a certified building.
THERMAL COMFORT TOOL
Retail-CI-v4 EQc5:Thermal comfortposted by Toshif Ruikar on
Hi,
CBE, Thermal comfort tool is not longer useful for LEED documentation, is there any other way to do provide thermal comfort documentation which is acceptable to LEED.
IAQ Testing Post Constuction - Pre Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Peter Del Sette, Jr on
I'm try to figure out how many tests I need to run for EQ3 V4.