Forum quick links
Integrative Analysis of Building Materials
CS-v4 INc1:Innovationposted by Chris Lombardo on
The project team was able to complete this pilot credit by reviewing information gathered during the material submittal process and analyze supporting product documentation.
Color muse device
NC-v4 EQc6:Interior lightingposted by Andrew Craven on
We have been pursuing Strategy E, Option 2 in the Interior Lighting credit. We have sealed concrete floors in most of the spaces, which is obviously done in the field and there is no manufact
PILOT CREDIT - ENERGY JUMPSTART
EBOM-v4 INc1:Innovationposted by Francisco j on
Hi Everyone,
We just wanted to tell you about our experience using this credit.
Photometric Calculations- Perimeter Wall
NC-v4 SSc6:Light pollution reductionposted by Zeynep Cakir on
Our project is located in LZ2 light zone. Bollard light fixtures are used for landscape and walkway lighting.
Joint use spaces on campus but not within boundary
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Purdy on
Thread from 2010, LEED 2.0 : https://leeduser.buildinggreen.com/forum/do-existing-spaces-count
Hi all,
Natural Ventilation in high-rise residential building
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
We are evaluating the possibility of certifying a high-rise residential building project that will be built in Portugal.
Multi floor Office Building - Can each floor be flushed as it gets installed?
CI-v4 EQc4:Indoor air quality assessmentposted by Susan Di Giulio on
Dear colleagues,
How to Apply for an Innovation credit? Leed v4 NC
NC-v4 INc1:Innovationposted by Carolina Cohen Freue on
Hello,
Gender Neutral Restrooms and Commercial Food Service Sinks
NC-v4 WEp2:Indoor water use reductionposted by Michael Kelly on
I'm trying to fill out the water reduction calc but I'm not sure how to account for GN restrooms and commercial kitchen sinks. This project has core restrooms with toilets and urinals.